Wyella Solutions

Operating systems for asset-intensive work

Site operations are fragmented across silos. KEVIN unifies them into one operating system.

One work object, one identity and one audit trail — from first signal to safe return to service.

KEVIN scorecard dashboard with target-vs-actual KPIs

Built by operators. Designed around the work.

Plant-tested operating patterns
One shared work object
One identity layer
One audit trail

Work rarely fails inside one system. It fails between them.

A work request begins in one place, technical context lives somewhere else, readiness is tracked in spreadsheets, and the field inherits the gaps. The result is familiar: duplicated effort, late discoveries and weak line-of-sight across the facility.

01

Disconnected context

Work orders, procedures, equipment history, permits and shift knowledge live in separate tools.

02

False readiness

A job can look scheduled while parts, hazards, access, isolation or Operations preparation remain unresolved.

03

Siloed handoffs

The work changes hands, but the full context does not travel with it.

04

Audit after the fact

Evidence is reconstructed from emails, attachments and individual memory instead of captured in the flow.

KEVIN. The colleague who never drops the ball.

The work-execution platform for the plant floor. KEVIN keeps the work object, the people, the controls and the evidence connected from backlog to return to service.

See how KEVIN works

One work object. Every team. Full traceability.

KEVIN gives each discipline the view it needs without breaking the shared thread.

SignalPrioritizePlanIsolate & permitExecuteReturn to serviceLearn
KEVIN backlog view showing prioritized work orders

Feature 01

Prioritize the work that matters.

Bring backlog, risk, age, equipment context and operational impact into one decision view, so planners spend their time planning instead of reconstructing priority from memory.

Backlog triageRisk-based prioritySaved role views
KEVIN maintenance plan view

Feature 02

Build a job that is actually ready.

Guide planners through steps, parts, tools, hazards, isolation, Operations preparation and return-to-service requirements before the job ever reaches the field.

Guided job plansReadiness gatesConstraint visibility
KEVIN permit-to-work issuance screen

Feature 03

Coordinate controls without losing the work.

Keep isolation, permits, approvals, tags and operating context connected to the same work object, from first signal to safe return to service.

Isolation contextPermit coordinationApproval history

KEVIN does not replace judgment. It clears the fog around it.

Recommend bundles, expose missing readiness, flag conflicting windows and surface similar work. Every recommendation shows its evidence so the user can accept, adjust or dismiss it.

Evidence-first recommendationsHuman approvalTraceable decisions

Bring us the workflow that keeps breaking.

We will map the current handoffs, identify the highest-friction points and show where a shared work-execution backbone can make the work clearer.